This report includes the projects that I personally involved and the areas I exposed during the internship of 6 months in Dipped Products PLC. These are the summary of the work I involved,
1. Glove manufacturing plant complete design.
2. Glove dipping machine design.
3. FEM analysis for the machine components and structural components ( Solidworks 2012_simulation xpress).
4. Design of a process bypass mechanism for a production line.
5. Thermal oil pipe line design for a plant modification and implementation.
6. Production drawing preparation of machine components for fabrication purpose.
(Budget is estimated considering all the projects involved)