Civil Eng - BIOSCRN

Closed Posted Jun 3, 2011 Paid on delivery
Closed Paid on delivery

Hi ,

I need you to do the modelling and the report . The deadline is after 3 days

, and I will require you to give me a draft or feedback with a sample of your work , in 24hour .

You will do the modelling , and write a 1000 word report about the task and calculations .

Can you do that ?

Your task is to carry out the modeling and write a 1000-word report

You are required to conduct an assessment of groundwater contamination using the BIOSCRN Natural Attenuation Decision Support System.

You will use the computer model and write a short technical report discussing your findings.

The report is to be approximately (i.e. within 10% of) 1000 words (excluding references and

abstract), and neatly formatted: size 12 font (Times New Roman, Arial, or similar), 1.5 line-spacing,

justified, and with appropriate use of numbered headings and sub-headings. Figures and tables

should be clearly numbered and referred to in the text.

The structure of your paper should include (at least):

? An introduction to the groundwater contamination problem

? A summary of the method

? The results of the modelling

? A discussion of uncertainty surrounding your results

Referencing should follow the Harvard Author-Date style and be consistent throughout the report.

For extensions and late submissions, the same conditions and penalties apply as with assignment 1.

Feedback on this assessment will be provided on the Feedback form. A hyperlink to a copy of this

form is included at the back of this booklet.

Arts & Crafts CAD/CAM Engineering Geolocation Odd Jobs Software Architecture Software Testing Training

Project ID: #3355545

About the project

1 proposal Remote project Active Jun 24, 2011

1 freelancer is bidding on average $43 for this job

moazzams

See private message.

$42.5 USD in 3 days
(0 Reviews)
0.0