Reduce Changeover Time in UPS

by jeddy1515
Portfolio

In Industrial UPS as per IEEE standards after line goes your inverter should run load less than 5 ms. If we go with AC to DC and then applied to ADC it will take more than 10 ms which is not acceptable so that i used ADC sensing and by my algorithm i could judge interruption in line within 2 ms and effective stoppage at the load would be max 4 ms. In image blue graph is representing the line voltage at the load and as it is gone inverter supply represented by yellow one.

image of username jeddy1515 Flag of India Surat, India

About Me

An Electronics engineer with experience of 5 years in design and development of Embedded and Power Electronics products. I have proficiency in following Software: 1. Keil/ATMEL Studio/MPLAB/ESP-IDF 2. MATLAB 3. Arduino IDE/Processing 4. Altium Designer/Eagle/Proteus/KiCAD 5. PLC/Citect SCADA/Visual IO/QT Hardware: 1. Any microcontroller, STM32, Arduino, Raspberry Pi, Beaglebone, Odroid, Banana Pi 2. ESP32,ESP8266 Wifi module, RF transceiver, GSM/GPRS Module, GPS, Bluetooth (nRF51822) 3. RFID, Fingerprint Sensor, Touch Keypad 4. Motion Sensor, Light Detector, Humidity Sensor, Gas Leakage Detector, IR Sensor, Ultrasonic Sensor, Accelerometer, Gyroscope 5. Hall sensor, Proximity, Encoder 6. Power Electronics Switches (SCRs, TRIACs, MOSFETs, IGBTs) 7. Thermocouple, RTD, Thermistor 8. Touch screen monitor, Camera 9. Charger Protocols: 1. SPI/I2S, I2C, UART(MODBUS), CAN, USB, Ethernet, SPDIF 2. HTTP, FTP, MQTT Platform: 1. Ubuntu, Debian, Raspbian, Arch Linux, FreeRTOS

$20 USD/hr

28 reviews
5.8

Tags