To design the load shedding for each stage of the UFLS scheme to minimize the total load shedding amount while ensure the frequency recovery to the acceptable frequency range efficiently under all tested system contingencies.
Closed
Posted
6 years ago
Paid on delivery
$80-240 HKD
Paid on delivery
Closed
Paid on delivery
Please refer to the attached file for details.
Project ID: #15708331
About the project
3 proposals
Remote project
Active 6 years ago
3 freelancers are bidding on average $504 for this job
vw7365269vw
Experienced electrical engineer in power electronics and power systems measuring and monitoring. Also have experience in MATLAB and dynamic system model design. Relevant Skills and Experience Electrical engineering. M More
$1111 HKD in 10 days
(0 Reviews)
0.0