Closed

Write a white paper on how to increase hydropower plant generation reliability

Seeking methods to increase hydropower plant generation reliability through the development of a tool, a group of tools, a continuous monitoring system, or a surveillance system that communicates with existing protection systems to safely perform comprehensive online testing, avoiding the opportunity cost of unit outages.

We are looking to develop innovative tool(s) to automate protection system testing at hydropower facilities. Tool or toolset design documentation will be reviewed by a panel of experts to determine if requirements are met, namely: (1) solutions are compatible with relays typically used in the hydropower industry, the solution automates relay input, PT signal, and CT signal verification, (3) the solution automates relay setting verification.

This project is envisioned as a two-phase approach seeking improvements and/or new and novel concepts to automate protection system testing hydropower facilities.

● Phase I: White Paper Solutions

● Phase II: Lab Prototypes

Phase I submissions shall be presented in the form of a document detailing hardware, hardware schematics, the operation of the hardware, programming code language, program logic diagrams, and a summary of output results. This may include text descriptions and datasheets for proposed solutions including sample results. Submissions shall demonstrate that the freelancer has a thorough understanding of interface requirements and protocols needed to communicate with the various manufactured relays and meters.

Looking to have 3 to 7 pages of text, schematics, flow charts with enough detail to demonstrate problem comprehension, and the ability to move from paper solution to prototype for lab demonstration and proof of concept.

Skills: Electrical Engineering, Electronic Design, Control System Design, Industrial Engineering, Control Engineering

See more: duties responsibilities operation maintenance engineer hydropower plant, write letter salary increase, write proposal letter increase salary, mures hydropower plant, white hat increase adsense, jinnah hydropower plant mianwali statistics, chashma hydropower plant job junior engineer, write an article suitable for electricity generation, hydropower plant, steps to make a hydropower plant model, is there a bui hydropower plant, how to make working model of hydropower plant, dargai hydropower plant, shadiwal hydropower plant, nam ngiep 1 hydropower plant, paper writing and report generation in research methodology, gabcikovo hydropower plant

About the Employer:
( 70 reviews ) Vancouver, Canada

Project ID: #28387851

5 freelancers are bidding on average $4000 for this job

umg536

Hi there, I'm bidding on your project "Write a white paper on how to increase hydropower plant generation reliability" we are a team of titanium certified developers. we excel inAutoCAD and solidworks enviroment along More

$10000 USD in 4 days
(3 Reviews)
3.9
roumaankhan

Hi. I am a Electrical Engineer and Matlab Expert I have many experiences in C/Machine language/Matlab/Python,Algorithm Simulation programming, software Architecture and Deep learning I am sure I can do it. You will get More

$2500 USD in 7 days
(0 Reviews)
0.0
technosystem

I have written several whitepapers for different industries. For last 18 years i have been developing Websites, Mobile apps, Blockchain, Decentralized Trading Exchanges, Crypto Coins based on ERC20, Bitcoin Core, X11, More

$2500 USD in 20 days
(0 Reviews)
0.0
dnx38

Hello,I am a mechatronics engineer skilled in process control and automation using Siemen's PLCs and embedded systems.I completed a government initiated project for optimizing performance of a medium hydropower plant.W More

$2500 USD in 20 days
(0 Reviews)
0.0
fatihcetinn

I am an Electronics and Communications Engineer. I have been giving trainings on Automation for 6 years, I have done projects. I have worked in panel design software commissioning works in the field. I worked as a mana More

$2500 USD in 10 days
(0 Reviews)
0.0