Closed

power system experts required

deadline: 8 hours

project is about optimal power flow using barnacles mating optimizer with applied matpower in case IEEE 30 bus.., I want you fix my opf coding to get the result fuel cost and power loss.., and the relate my algorithm to matpower toolbox.., for matpower, i use case_ieee30, that's all, and also in the result i want keep power output for generator, bus voltage, shunt capacitor/reactor and transformers tap setting in their secure limit..

Skills: Electrical Engineering, Matlab and Mathematica, Electronics, Engineering, Verilog / VHDL

See more: bid hours project web design, information required start directory submission project, hours project time counter, ecommerce experts required, kayako experts required, automotive worldwide global experts required, excel add calculate work hours project, modules required online fee submission project, online experts required, total hours project redmine, 200 hours project, openerp experts required, 300 hours project, sem experts required, experts required wordpress, computational linguistics nlp experts required, hours project php help, book this project 6 days 8 hours left open bids 1 avg bid (idr) rp555555 project budget (idr) rp300k - rp3m project description

About the Employer:
( 35 reviews ) Balakong, Malaysia

Project ID: #30531138

2 freelancers are bidding on average $120 for this job

ExpertSoul

Hello, I am a PhD candidate in Electrical Engineering (Control System). I have plenty of experience in firmware development and micro-controller developments. My Core Skills are: -MATLAB, SIMULINK MODLING AND SIMULAT More

$100 USD in 2 days
(102 Reviews)
6.2
Lily2k18

Hi! How is your day going on? Regarding this project is about optimal power flow using barnacles mating optimizer with applied matpower in case IEEE 30 bus. I am well versed in electrical Engineering assignments, Data More

$140 USD in 2 days
(1 Review)
2.4