Reformat all instances of dates (3 columns in each CSV) in 13 CSVs from 0000,0,0 to 0000,00,00
Eg: 2012,7,9 becomes 2012,07,09
or 2012,2,31 becomes 2012,02,31
There are a few poorly formatted dates in there as well (possibly 5 or more in total)
The three columns that need editing are Post Date, Theme Timeline Start Date and Theme Timeline End Date.
Hello, ready to do this for you as soon as possible. Seems to be fairly easy task, can perform it with a script and then check results manually.
Thanks,