In order for this bid to be valid I must be able to review the plans and accept the job. I don't want to be stuck with a project that I can not complete at my required minimum hourly rate.
I have been involved in a number of ammonia plants in China that were in the $6M range based off of a pilot plant in Texas, USA. 3 of them were 2 train plants and 1 was a 3 train plant, "train" meaning there were twin or triple production lines.
I was involved in vessel design, decks and ladders, tubing support structures, pipe routes, P&IDs, One line diagrams, concrete layout, equipment placement, etc.
I would like the chance to review your project before accepting the job,
Sincerely,
Eric