Wordpress header tab change order jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Skills
Languages
    Job State
    2,153 wordpress header tab change order jobs found, pricing in GBP

    I have created an excel file with many tabs. Each tab contains a tool. There is an index page that contains the list of all tools and each tool is linked to the corresponding page via hyperlink. I have added a code that I found on the internet to unhindered the corresponding tab when the hyperlink is used and hide it again when navigating back to the

    £15 (Avg Bid)
    £15 Avg Bid
    7 bids

    ...not work correctly. If pressed, it should reset all color to default. -Slider control. “Selected Color” should change as slider is moved. Currently the user has to click on the “gradient box” for “selected color” to change. -Add “Reset tab” to plugin menu. Both from toolbar and right click. Same functionality as reset butt...

    £138 (Avg Bid)
    £138 Avg Bid
    6 bids

    ...and formatted into csv file as attached. Needs to be formatted exactly. 3. txt file then gets emailed to another person on a daily basis. 4. If other products exist in order, split order in shipstation, Orders being sent to factory should be put on hold until we receive tracking. We have an existing plugin that we like, but it doesn't format it. THE

    £121 (Avg Bid)
    £121 Avg Bid
    16 bids

    We are looking for help with development of a 5-tab app for a small restaurant business. We are creating the iOS version and we need help with the creation of the Android version. ** THE APP MUST BE ADA COMPLIANT: Americans with Disabilities Act FOR ACCESSIBILITY ** 1. Splash screen: Small animated logo sequence (fade in) 2. App Icon: We will provide

    £456 (Avg Bid)
    £456 Avg Bid
    39 bids

    I need a java script code to help me redirect user to a specific url when he closes my tab. Must work for chrome and firefox

    £16 (Avg Bid)
    £16 Avg Bid
    27 bids

    I need you to create a Text File where you manually enter a series of addresses from a list of locations...where you manually enter a series of addresses from a list of locations in a series of images attached below - It is Done in a "Triple Alphabetical" fashion - Use the correct order from the top to Bottom. let me know if you have any questions

    £16 (Avg Bid)
    £16 Avg Bid
    50 bids

    I made a site with WordPress. If you click on a banner (post, page, portfolio, etc.), it is usually a page transition. However, it takes a long time to load the page. So what I want is When I click on the banner, I want to implement the contents of the banner in a tab style, not a page change. We show sample site. Note please. [login to view URL]

    £279 (Avg Bid)
    £279 Avg Bid
    46 bids

    I have a completed a website and has the source file. I need someone to make it responsive for mobile, tablets and high resolution desktops. Please view the link below and give us the proposal asap. I need it in 3 days of time. [login to view URL]

    £32 (Avg Bid)
    £32 Avg Bid
    15 bids

    I want someone to send me an APK file of Instagram for android edited that has removed all images inside. I just want to use the app to do the ...the app to do the Instastories at the top and check my stats. Everything else is a distraction and really don't care to see it. So mission is to remove newsfeed and explore tab. My phone is the Galaxy S7.

    £109 (Avg Bid)
    £109 Avg Bid
    6 bids

    I need to add a custom page tab to the left side of my Facebook menu. I have tried to do this through Facebook Developer but am not able to. I need to work with someone who KNOWS how to do this. The last Freelancer said he knew how to do it, but did not. I will get on SKYPE with you. It should take no more than a half hour.

    £40 / hr (Avg Bid)
    £40 / hr Avg Bid
    2 bids

    Paperless Employee Onboarding Software (Android Tab App integrated with HRMS Web Application) Features: 1. eForm based interface to fill onboarding details 2. esignature - stylus or fingertip based signature 3. esignature superimposed on form 4. mobile OTP based aadhar authentication 5. scanned document upload 6. checklist for completion of onboarding

    £578 (Avg Bid)
    £578 Avg Bid
    16 bids

    Hi, i have a xml background layout of android there, i just want when you swip, it change for tab. A demo of it will show you in chat. In attach a demo of the layout. You get the code of what i have, you just need to make the tab move to another page tab. nothing more Less bid win.. Im thinking around 25$

    £18 (Avg Bid)
    £18 Avg Bid
    26 bids

    [login to view URL] Im looking for a freelancer who is able t...com/lista/balatoni-minimax-hajo/ Im looking for a freelancer who is able to fix the "Jegy" button link to the "Jegyvásárlás" tab. The border-bottom should be blue if its active, and if im trying to go back to the another tab ("Részletek") it not works.

    £26 (Avg Bid)
    £26 Avg Bid
    49 bids

    ...the payment method tab. Tabs can be user specific, so whenever any customer added to website, I can create different contract tab, payment method tab, work progress tab etc. Any plugin or coding in which I can change the tabs (I am not aware of php and CSS ), suggestions are welcome. Please write the subject line "customize tab" before propo...

    £87 (Avg Bid)
    £87 Avg Bid
    22 bids
    £27 Avg Bid
    12 bids

    I have an existing wordpress website and I require a blog page so I can post blogs. Please provide me with a link of work completed.

    £20 (Avg Bid)
    £20 Avg Bid
    80 bids

    ...nav bar (tabs) done up which displays the following tabs by default - Event Info and Round #1. 2. There needs to be a third tab shown, which will allow two more tabs to be added to the bar, after Round 1 but before the add tab button. 3. The Round 2 and Round 3 tabs need to have a cross on them to allow them to be deleted. Event Info and Round #1 can

    £16 (Avg Bid)
    £16 Avg Bid
    10 bids

    anuglarjs directive is not working in internet explorer on tab from the text box

    £18 (Avg Bid)
    £18 Avg Bid
    9 bids

    Hi ! I'm looking for someone to remove the "Additional information" tab of my single product page on Wordpress AVADA theme template.

    £20 (Avg Bid)
    £20 Avg Bid
    36 bids

    i need a visual [login to view URL] test dialog that read the url in the active browser and active tab. This for the latest version of all major browsers. Edge, firefox and chrome The dialog has 1 text window. The program gets the url from the active browser which is in focus. it also need to work for different languages of the browsers.

    £83 (Avg Bid)
    £83 Avg Bid
    4 bids

    ...She owns two furniture shops. Therefore, I enable Facebook multiple locations service and set up a sub page for each location. I got it working ok on desktop but the location tab won't load on mobile. Also, the map is not at a fixed zoom like his competitors page which is what he wants. He wants everything like the freedom Australia page. I don't know

    £3 / hr (Avg Bid)
    £3 / hr Avg Bid
    3 bids

    Hi We have an app built on KIVY (GUI) Backend is in python and php. Developer should know 4 things: 1-: multi...api firstly: [login to view URL]) 2- PHP 3-Python 4: KIVY For someone with knowledge of all 4, this should be a very simple task. We need a tab and corresponding page to the app built on KIVY (the GUI part).

    £30 (Avg Bid)
    £30 Avg Bid
    7 bids

    I need a product tab to be added to the shopify front end which has all of a product ingredients, this would be placed next to the two tabs already there: Product description and reviews. The store uses a theme Funify which can be found on themeforest There needs to be somewhere in the back end for each product to add ingredients and if left blank

    £22 (Avg Bid)
    £22 Avg Bid
    12 bids

    I need a Salesforce App that creates t...Custom Object with several fields (Text, AutoId, Date, 3 lookup relationships to User/Contact/Lead) and Custom Layout - A Custom Tab - Change Design of related list in Lead/Contact You create this app and we are then able to change minor details (name of field, etc.) and are able to publish the App ourselves.

    £131 (Avg Bid)
    £131 Avg Bid
    9 bids

    Please Do Not bid until you read the project details. We won't accept your bid if you don't read the attached Word document detailing the job description and changes that need to be made.

    £193 (Avg Bid)
    £193 Avg Bid
    20 bids

    I need a new website. I need you to design and build a website for my small business.

    £78 (Avg Bid)
    £78 Avg Bid
    85 bids

    In an Xamarin application for android, need the tab bar in bottom along with the badge count. We have come across with a control on github [login to view URL] that does the tab bar in bottom for android - but lacks the badge counter. So, here are the two possibilities: 1) Either provide the extended version of the

    £83 (Avg Bid)
    £83 Avg Bid
    3 bids

    Two songs, i would like better in GP5 guitar pro 5. The songs are: War of ages - Wages of sin War of ages - Generational curse

    £13 (Avg Bid)
    £13 Avg Bid
    5 bids

    ...collection of Fernando Sor's sheet music that I would like someone to transcribe to TAB guitar format (approximately 80% of them, as some have already been transcribed). Please look at the image file and the example txt file to see an example of what the finished TAB would look like. The guitar fingerings should be worked out to be the most effective

    £4 / hr (Avg Bid)
    £4 / hr Avg Bid
    7 bids

    ...will also include the Acrobat forms themselves, but unless you have Acrobat's Edit Form capability you won't be able to see the field alphanumeric names or the field sequence order. Extra consideration will go to those who know xml and VBA, since I expect to incorporate the forms into a website and import completed form data into a database. Someone familiar

    £24 (Avg Bid)
    £24 Avg Bid
    17 bids

    The project involves the creation of a responsive page, for access to crm with login part with tab switch 1 employee portal access 2 access to the customer portal all for crm vtiger7.1 the image is purely for example provided the login details for interfacing the access to crm and customer portal

    £44 (Avg Bid)
    £44 Avg Bid
    9 bids

    The project involves the creation of a responsive page, for access to crm with login part with tab switch 1 employee portal access 2 access to the customer portal all for crm vtiger7.1 the image is purely for example provided the login details for interfacing the access to crm and customer portal

    £26 (Avg Bid)
    Guaranteed
    £26
    17 entries

    Hello We have a site being developed in Magento 2.2 on the product page we have made some changes to the original theme - by adding a second tab section and also Pagination. Current issues are that the Tabs are not focusing on correct location when being used in mobile. Pagination developed - is not stable - it is moving randomly and not useable

    £37 (Avg Bid)
    £37 Avg Bid
    16 bids

    hey guys having trouble with my wordpress website, have a tab according built with the wordpress builder, but when clicking to open tab it just scrolls down page rather than opens

    £15 (Avg Bid)
    £15 Avg Bid
    24 bids

    ...someone to make a facebook JOB tab; the data will be provided by us - what needs to happen is the end user needs to authenticate the App (login with Facebook's login popup), if the user has multiple COMPANY PAGE then user needs to choose it and upon submission a JOB tab is created in the Facebook. The data to the tab will be provided by us (iFrame

    £122 (Avg Bid)
    £122 Avg Bid
    10 bids

    I ...already set up, with another developer, custom tabs. These also accordian in mobile view as well. All of this is handled through functions.php. I have tried to add another tab in using limited knowledge and can't get the extra one to pop up so I just need someone to edit the existing code I have to get it finished. Will message for more details

    £73 (Avg Bid)
    £73 Avg Bid
    85 bids

    We need user to select specific tables or columns and export their saved data to a TAB DELIMITED file.

    £111 (Avg Bid)
    £111 Avg Bid
    17 bids

    I have more than 5000 folders, in each of which there are three tab files. Each folder represents a company, and each company has three tab files: comments, fullstats, and statsperday. I need a program (VBA or something like that) to automatically grab tab files from each folder and append them together by their types. Not only that, I need the folder's

    £97 (Avg Bid)
    £97 Avg Bid
    43 bids

    I just need someone to teamviewer to my device. Bluetooth has been working sometimes and not other times. I restarted my computer which normally fixes the problem, but it didn't this time so I updated my PC and installed all Samsung and Windows Update. This has not fixed the problem. Any assistance would be appreciated. Thank you

    £12 (Avg Bid)
    £12 Avg Bid
    3 bids

    I need a javascript code to click tab and enter after page loads. 1 Page Load 2 Tab key (First element select) 3 Enter press

    £23 (Avg Bid)
    £23 Avg Bid
    15 bids

    ...import a tab delimited text file into an array, return the list of clients that has matched email address for population as value for a listbox control in outlook vba. Please refer to attached file, there's 3 columns of data: client, address and email. Code to 1. import tab delimited file into array. 2. search through data under header called "email"

    £27 (Avg Bid)
    £27 Avg Bid
    4 bids

    ...variations, I want to display them under the additional information tab See attached screenshots with example of "certified organic" I have attribute called certified organic which has "visible on product page" enabled. This should therefore show under "additional information" tab on product page - DO NOT edit core files (use existing child theme

    £32 (Avg Bid)
    £32 Avg Bid
    20 bids

    ...variations, I want to display them under the additional information tab See attached screenshots with example of "certified organic" I have attribute called certified organic which has "visible on product page" enabled. This should therefore show under "additional information" tab on product page - DO NOT edit core files (use existing child theme

    £87 (Avg Bid)
    £87 Avg Bid
    51 bids

    I want to Add a “post jobs” tab on my business Facebook page, is some one of the coder know how to do it, its some fb setting...thank you

    £18 (Avg Bid)
    £18 Avg Bid
    5 bids

    ...print();'); This solution comes up with two problems: 1. It still opens a dialog for print confirmation. 2. It opens the print preview and the dialog box in my current tab which means that on clicking print, I cannot get the same interface on which I was working before clicking Print. For that, I have to click on back button on the browser which

    £10 (Avg Bid)
    £10 Avg Bid
    4 bids

    Develop for shopify: Logo, tab logo, text for website (about us, contact us, etc..) and Edit Picture size for the website.

    £36 (Avg Bid)
    £36 Avg Bid
    9 bids

    I need to open a chrome tab via javascript from parent window that should be of size 500px X 500px and should reside in bottom right corner of the user starting from behind the taskbar and not above it. Refer to images. I don't want it like [login to view URL] but instead like 2.png. Should be a fast gig for someone who already know this. Anyone coming up with

    £19 (Avg Bid)
    £19 Avg Bid
    9 bids

    fix backend php code add webpage tab design

    £92 (Avg Bid)
    £92 Avg Bid
    30 bids

    Hello We have a site being developed in Magento 2.2 on the product page we have made some changes to the original theme - by adding a second tab section and also Pagination. Current issues are that the Tabs are not focusing on correct location when being used in mobile. Pagination developed - is not stable - it is moving randomly and not useable

    £46 (Avg Bid)
    £46 Avg Bid
    11 bids

    Have a Transparent layer of drum tabs over the current play area of the game. Learn To Master Drums is an app by Learn To Master. [login to view URL] See Project Brief attached.

    £395 (Avg Bid)
    £395 Avg Bid
    21 bids